How soon after the concrete has been laid can the resin flooring be installed?

 In

Polyurethane Screed after 7 days depending on how much water has been used in the concrete, and site conditions. Plus we do have a Resin Liquid Damp Proof Membrane.

Recent Posts

Leave a Comment